Made in Russia

All regions
ENG

Krasnodar Boiler and Power Equipment Plant

The plant is engaged in production of boiler equipment that can compete with foreign manufacturers. One of the main activities of the enterprise is production of modern, reliable and highly efficient equipment for small and medium heat and power engineering.
Download presentation

The ECO-PAR range of industrial steam generators as well as block-modular steam and hot water boilers are manufactured here.

Customers of the plant can order here the work of a full cycle - from design, completing and manufacturing to installation, commissioning and putting into operation.

Production is located on the territory of 7 thousand square meters. Application of modern technological equipment allows to solve problems comprehensively and at low cost. As a result, customers receive the most competitive and affordable services.

The plant is also engaged in construction of boilers on a full cycle. In particular, the enterprise prepares executive documents for the customer at the initial stage and approves equipment operation in supervising organizations.

Besides, the Krasnodar plant draws up boiler mode charts, delivers boiler equipment to customers not only in Russia, but also in the countries of the Customs Union.

Contact the representatives
Want to ask a brand representative a question? Send a message
By pressing the "Send message" button, you agree toprivacy policy